Bridges

Location Description Client Value Rs. Million Duration
Gampaha District, Western Province, Sri Lanka
BADLGAMA BRIDGE
The super structure of the bridge was a steel prefabricated structure which is 28.8 meters long accommodating two traffic lanes. The Badalgama Bridge is a vital link connecting the towns of Negombo and Giriulla (B322). Two abutments were supported by cast in-situ board piles with perment steel casing. Two immediate approaches were also constructed as part of this project. Funded under the French Government Financial Package for a contract amount of LKR 133 Million, the bridge was declared open in February 2016.
Road Development Authority of Sri Lanka 133.0 13 Months
Construction of New Bridge Over Malwathu Oya on Wijepura Dharmapala Mawatha at Anuradhapura (Non RDA) in Anuradhapura District. Contract No: RDA/DW/NCP/GOSL/209 Director General, Road Development Authority, 1st Floor, “Sethsiripaya”, Battaramulla. 78.6
Road Sector Development Project Phase II Bridge Package LCB : NWB-01 Provincial Project Direoctor, Road Sector Development Project (NWP), North Werstern Provincial Road, Wehera, Kurunegala. 72.8
Construction of New Bridge Over Malwathu Oya on Wijepura Dharmapala Mawatha at Anuradhapura (Non RDA) in Anuradhapura District Contract No: RDA/DW/NCP/GOSL/209 Chief Engineer (Anuradhaprua), Road Development Authority, Anuradhapura. 20.0
Construction of Bridge Across Kanadara Oya at Asirigama Road. Contract No: RDA/DW/NCP/GOSL/194 Director General, Road Development Authority, 1st Floor, “Sethsiripaya”, Battaramulla. 15.0
Reconstruction of Bridge No: 8/1 on Chavakachcheri – Puloly Road and Immediate Approaches. Contract No. RDA/MMC/BD/80 Director General, Road Development Authority, 1st Floor, “Sethsiripaya”, Battaramulla. 12.0
 

Edward and Christie

No. 64/9, Nawala Road,

Nugegoda, Sri Lanka

Tel :+94-112812990,2812991

Fax :+94-11 2812441

Email :edchrist@sltnet.lk, reply.enc@gmail.com