Rehabilitation of Ambepussa - Kurunegala - Trincomalee Road
See Project
E&C were commissioned to construct a “ginipetti palama” by the Road Development Authority. The project is valued at over Rs. 115 mn and includes the construction of the bridge across Kumbukkan Aru, Concrete Abutment 7.01 and 11.5m long PSC beam launch and deck concrete, gabion work and installation of light posts with solar panel and is 25m in length and is the first time such a design and technique was used in Sri Lanka.