Rehabilitation of Ambepussa - Kurunegala - Trincomalee Road
See Project
E&C were commissioned to construct the approaches to bridge no. 19/4 by the Road Development Authority. The project was valued at over Rs. 132 mn and includes the construction of a sub structure, transportation and erection of super steel structure, construction of 1200 mm dia board pile and abutment, Reinforced concrete sheet piles, transportation of 28.8m long 2 lane wide unibridge superstructure components, reception and launching. The bridge is 28.8m in length.