Rehabilitation of Bridge No 3/3 Across Ma Oya on Makandura - Badalgama Road (B 503)

Project Description

E&C were commissioned to rehabilitate part of the Ma Oya bridge by the RDA. The project was valued at over Rs. 240 mn and includes the rehabilitation and reconstruction of the bridge and its approaches, a sand arrester wall and a toe wall. It also includes the construction of a 1200mm dia board pile, abutment, and 25m long precast beam launch and deck concrete over the course of this project we had to overcome heavy rains and floods

Segment

BRIDGES

E&C is one of the few within the island holding the C2 grade when it comes to bridge construction, and possesses the machinery, equipment and track record that instills confidence and peace of mind in the minds of our clients when it comes to completing their project in the most effective and efficient way possible.